Troy Lee Designs Flowline MTB Helmet with MIPS - Orbit - Youth - Black
The all-new Flowline Helmet is hand-picked, literally, by the pros and for good reason. The Flowline Helmet features a combination of comfort, safety and signature TLD style. It's NTA-8776 certified, making it the perfect choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.
- 3-Way adjustable screwless visor
- NTA-8776 certified for E-Bike usage
- MIPS B-Series Rotational Impact Brain Protection System
- Full 360-degree fit retention system with 3-way rear height adjustment
- 14 vents for maximum airflow
- Full wrap in-mold construction
- Extended Coverage MTB Trail Helmet
- Side strap adjusters
- 5-Star Virginia Tech safety rating
Product Information
Product Information
Shipping & Returns
Shipping & Returns





Troy Lee Designs Flowline MTB Helmet with MIPS - Orbit - Youth - Black
Troy Lee Designs Flowline MTB Helmet with MIPS - Orbit - Youth - Black
The all-new Flowline Helmet is hand-picked, literally, by the pros and for good reason. The Flowline Helmet features a combination of comfort, safety and signature TLD style. It's NTA-8776 certified, making it the perfect choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.
- 3-Way adjustable screwless visor
- NTA-8776 certified for E-Bike usage
- MIPS B-Series Rotational Impact Brain Protection System
- Full 360-degree fit retention system with 3-way rear height adjustment
- 14 vents for maximum airflow
- Full wrap in-mold construction
- Extended Coverage MTB Trail Helmet
- Side strap adjusters
- 5-Star Virginia Tech safety rating
Original: $53.40
-70%$53.40
$16.02Product Information
Product Information
Shipping & Returns
Shipping & Returns
Description
The all-new Flowline Helmet is hand-picked, literally, by the pros and for good reason. The Flowline Helmet features a combination of comfort, safety and signature TLD style. It's NTA-8776 certified, making it the perfect choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.
- 3-Way adjustable screwless visor
- NTA-8776 certified for E-Bike usage
- MIPS B-Series Rotational Impact Brain Protection System
- Full 360-degree fit retention system with 3-way rear height adjustment
- 14 vents for maximum airflow
- Full wrap in-mold construction
- Extended Coverage MTB Trail Helmet
- Side strap adjusters
- 5-Star Virginia Tech safety rating














