🚚 Free Worldwide Shipping on All Orders!Shop Now
HomeStore

Troy Lee Designs Flowline MTB Glove - Peace-Up - Cobalt

Product image 1
Product image 2
Product image 3
Product image 4

Troy Lee Designs Flowline MTB Glove - Peace-Up - Cobalt

Troy Lee Designs Flowline MTB Glove - Peace-Up - Cobalt

Troy Lee Designs Flowline MTB Glove

The Troy Lee Designs Flowline MTB Glove is built for comfort, ventilation, and performance, offering a lightweight feel with essential protection. Designed and tested by top athletes, this glove ensures optimal grip and control while keeping your hands cool on every ride.

Key Features

  • Adjustable Velcro Cuff – Secure and customizable fit.
  • Single-Layer Palm – Mapped laser perforations for enhanced breathability.
  • Micro-Mesh Construction – Maximum airflow for all-day comfort.
  • Touchscreen Compatibility – Use your devices without removing your gloves.
  • Sublimated Graphics – Stylish and durable design.

Perfect for trail, enduro, and downhill riders, the Flowline Glove delivers a balanced mix of comfort, protection, and performance for every ride.

Select Color
Select Size
From $10.50

Original: $35.00

-70%
Troy Lee Designs Flowline MTB Glove - Peace-Up - Cobalt—

$35.00

$10.50

Product Information

Shipping & Returns

Description

Troy Lee Designs Flowline MTB Glove

The Troy Lee Designs Flowline MTB Glove is built for comfort, ventilation, and performance, offering a lightweight feel with essential protection. Designed and tested by top athletes, this glove ensures optimal grip and control while keeping your hands cool on every ride.

Key Features

  • Adjustable Velcro Cuff – Secure and customizable fit.
  • Single-Layer Palm – Mapped laser perforations for enhanced breathability.
  • Micro-Mesh Construction – Maximum airflow for all-day comfort.
  • Touchscreen Compatibility – Use your devices without removing your gloves.
  • Sublimated Graphics – Stylish and durable design.

Perfect for trail, enduro, and downhill riders, the Flowline Glove delivers a balanced mix of comfort, protection, and performance for every ride.